Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. Permitting Under the Clean Air Act

Florida Proposed Title V Permits

EPA is updating the Electronic Permitting System. Throughout the transition, permit actions will be uploaded to this page weekly beginning the week of 1/6/25 until the new public dashboard is available. The first table was last updated on 5/20/25. The second table stopped updating on 12/13/24. Please direct any questions to akers.brad@epa.gov.
Facility Name Permitting Authority Permit Number Title V Permit Action Submission Category Public Notice Period End of EPA 45-day Review Petition Period Files 
CHANCEY METALS, LLC. Florida DEP 0310341-014-AV Renewal Proposed   6/30/2025 7/1/2025-9/2/2025

Proposed Permit 0310341-014-AV (pdf) (867.38 KB)

Statement of Basis 0310341-014-AV (pdf) (185.89 KB)

FLORIDA GAS TRANSMISSION COMPANY, LLC., COMPRESSOR STATION NO. 18

Florida DEP 0950190-013-AV Renewal Proposed   6/30/2025 7/1/2025-9/2/2025

Proposed Permit 0950190-013-AV (pdf) (832.29 KB)

Statement of Basis 0950190-013-AV (pdf) (334.79 KB)

BINDERHOLZ LIVE OAK, LLC., SUWANNEE MILL Florida DEP 1210468-011-AV Significant Modification Final (5/6/25)     5/6/2025-7/7/2025

Final Permit 1210468-011-AV (pdf) (896.87 KB)

Statement of Basis 1210468-011-AV (pdf) (676.95 KB)

LAKELAND ELECTRIC, WINSTON PEAKING STATION Florida DEP 1050352-015-AV Renewal Draft 5/15/2025-6/13/2025    

Draft Permit 1050352-015-AV (pdf) (766.93 KB)

Statement of Basis 1050352-015-AV (pdf) (348.48 KB)

TAMPA ELECTRIC COMPANY (TEC), BIG BEND STATION

Florida DEP 0570039-157-AV Renewal Proposed   6/30/2025 7/1/2025-9/2/2025

Proposed Permit 0570039-157-AV (pdf) (2.27 MB)

Statement of Basis 0570039-157-AV (pdf) (195.39 KB)

SUWANNEE AMERICAN CEMENT COMPANY, LLC., BRANFORD CEMENT PLANT Florida DEP 1210465-065-AV Renewal Draft 5/15/25-6/16/25    

Draft Permit 1210465-065-AV (pdf) (1.54 MB)

Statement of Basis 1210465-065-AV (pdf) (224.34 KB)

CITY OF JACKSONVILLE, TRAIL RIDGE LANDFIELD Florida DEP 0310358-020-AV   Proposed   6/30/2025 7/1/2025-9/2/2025

Proposed Permit 0310358-020-AV (pdf) (1.35 MB)

Statement of Basis 0310358-020-AV (pdf) (179.16 KB)

 CMC Steel Florida Florida DEP 0310157-023-AV Significant Modification Final (5/13/2025)     5/13/2025-7/14/2025

Final Permit 0310157-023-AV (pdf) (1.01 MB)

Statement of Basis 0310157-023-AV (pdf) (143.08 KB)

HIT PROMOTIONAL PRODUCTS, INC. Florida DEP 1030313-021-AV Significant Modification Proposed   6/30/2025 7/1/2025-9/2/2025

Proposed Permit 1030313-021-AV (pdf) (535.54 KB)

Statement of Basis 1030313-021-AV (pdf) (307.24 KB)

Panama City Production Facility Florida DEP 0050102-003-AV Initial Draft 4/18/2025-5/18/2025    

Draft Permit 0050102-003-AV (pdf) (705.03 KB)

Statement of Basis 0050102-003-AV (pdf) (124.52 KB)

CertainTeed Gypsum Palatka Florida DEP 1070039-038-AV Significant Modification Proposed   6/2/2025 6/3/2025-8/4/2025

Proposed Permit 1070039-038-AV (pdf) (1.2 MB)

Statement of Basis 1070039-038-AV (pdf) (329.22 KB)

Owens Corning Roofing and Asphalt Florida DEP 0310050-043-AV Significant Modification Proposed   6/6/2025 6/7/2025-8/6/2025

Proposed Permit 0310050-043-AV (pdf) (1.16 MB)

Statement of Basis 0310050-043-AV (pdf) (278.12 KB)

Taminco Place Plant Florida DEP 1130004-046-AV Renewal Draft/Proposed   5/1/2025 5/2/2025-7/1/2025

Draft/Proposed Permit 1130004-046-AV (pdf) (1.47 MB)

Statement of Basis 1130004-046-AV (pdf) (263.48 KB)

MIDNIGHT EXPRESS POWERBOATS, INC. Florida DEP 0251388-008-AV Modification Draft 4/3/2025-5/5/25    

Draft Permit 0251388-008-AV (pdf) (519.83 KB)

Statement of Basis 0251388-008-AV (pdf) (134.6 KB)

CHANCEY METALS, LLC Florida DEP 0310341-014-AV Renewal Draft 4/3/2025-5/5/25    

Draft Permit 0310341-014-AV (pdf) (740.75 KB)

Statement of Basis 0310341-014-AV (pdf) (185.88 KB)

TPSI TERMINALS, LLC., TRANSMONTAIGNE TAMPA TERMINAL Florida DEP 0310358-020-AV Renewal Draft 4/3/2025-5/5/25    

Draft Permit 0310358-020-AV (pdf) (1.16 MB)

Statement of Basis 0310358-020-AV (pdf) (175.61 KB)

SUWANNEE AMERICAN CEMENT COMPANY, LLC., SUMTERVILLE CEMENT PLANT Florida DEP 1190042-028-AV Modification Final (2/21/2025)   02/20/25 02/21/25-4/22/25

Final Permit 1190042-028-AV (pdf) (1.1 MB)

Statement of Basis 1190042-028-AV (pdf) (270.34 KB)

Okeelanta Cogeneration Plant

Florida DEP 0990005-051-AV Renewal Proposed   4/4/2025 4/5/2025-6/4/2025

Proposed Permit 0990005-051-AV (pdf) (1.5 MB)

Statement of Basis 0990005-051-AV (pdf) (272.71 KB)

Binderholz Live Oak, LLC., Suwannee Mill Florida DEP 1210468-011-AV Modification Proposed   5/5/2025 5/6/2025-7/7/2025

Proposed Permit 1210468-011-AV (pdf) (1.13 MB)

Statement of Basis 1210468-011-AV (pdf) (677.01 KB)

CENTRAL DISTRICT WASTEWATER TRTMNT PLANT  Florida DEP 0250476-018-AV Renewal Final (3/18/2025)   3/17/2025 3/18/2025-5/19/2025

Final Permit 0250476-018-AV (pdf) (940.54 KB)

Statement of Basis 0250476-018-AV (pdf) (153.32 KB)

MAVERICK BOAT GROUP Florida DEP 1110086-018-AV Renewal Final (3/19/2025)   3/20/2025 3/21/2025-5/20/2025

Final Permit 1110086-018-AV (pdf) (814.12 KB)

Statement of Basis 1110086-018-AV (pdf) (121.09 KB)

CEMEX Miami Cement Plant Florida DEP 0250014-076-AV Significant Modification Proposed 2/23/2025-3/25/2025 5/12/2025 5/13/2025-7/14/2025

Proposed Permit 0250014-076-AV (pdf) (1.68 MB)

Statement of Basis 0250014-076-AV (pdf) (291.45 KB)

Florida Power & Light Company, Gulf Clean Energy Center Florida DEP 0330045-069-AV Administrative Amendment Final (1/28/2025)       Final Permit 0330045-069-AV (pdf) (434.24 KB)
CMC STEEL FLORIDA  Florida DEP  0310157-023-AV Modification Proposed   5/12/2025 5/13/2025-7/14/2025

Proposed Permit 0310157-023-AV (pdf) (1.22 MB)

Statement of Basis 0310157-023-AV (pdf) (143.08 KB)

Taminco Pace Plant Florida DEP  1130004-046-AV Renewal Draft 3/21/25-4/20/25     Draft Permit 1130004-046-AV (pdf) (14.19 MB)
WHITEHOUSE LUMBER OPERATIONS  Florida DEP  0310197-022-AV  Modification  Proposed    4/21/25  4/22/25-5/22/25

Proposed Permit 0310197-022-AV  (pdf) (546.63 KB)

Statement of Basis 0310197-022-AV  (pdf) (139.55 KB)

NUCOR STEEL FLORIDA, INC.  Florida DEP  1050472-008-AV  Modification  Proposed    4/21/25  4/22/25-5/22/25

Proposed Permit 1050472-008-AV  (pdf) (1.01 MB)

Statement of Basis 1050472-008-AV  (pdf) (141.87 KB)

FLORIDA'S NATURAL GROWERS  Florida DEP  1050002-013-AV  Modification  Proposed    4/10/25  4/11/25-5/12/25

Proposed Permit 1050002-013-AV  (pdf) (821.3 KB)

Statement of Basis 1050002-013-AV  (pdf) (152.41 KB)

GLADES SUGAR HOUSE  Florida DEP  0990026-052-AV  Modification  Proposed    4/7/25  4/8/25-5/8/25

Proposed Permit 0990026-052-AV  (pdf) (1.19 MB)

Statement of Basis 0990026-052-AV  (pdf) (275.21 KB)

FLORIDA GAS TRANSMISSION COMPANY COMPRESSOR STATION NO. 19 Florida DEP  0090106-009-AV  Renewal  Proposed    4/7/25  4/8/25-5/8/25

Proposed Permit 0090106-009-AV  (pdf) (630.9 KB)

Statement of Basis 0090106-009-AV  (pdf) (258.18 KB)

FLOWERS BAKING CO. OF LAKELAND, INC  Florida DEP  1050325-011-AV  Renewal  Proposed    4/7/25  4/8/25-5/8/25

Proposed Permit 1050325-011-AV  (pdf) (900.03 KB)

Statement of Basis 1050325-011-AV  (pdf) (142.73 KB)

LAKE CITY  Florida DEP  0230046-009-AV  Renewal  Proposed    4/4/25  4/5/25-5/5/25

Proposed Permit 0230046-009-AV (pdf) (790.67 KB)

Statement of Basis 0230046-009-AV  (pdf) (131.28 KB)

BAPTIST MEDICAL CENTER  Florida DEP  0310010-014-AV  Renewal  Proposed    3/31/25  4/1/25-5/1/25

Proposed Permit 0310010-014-AV  (pdf) (949.62 KB)

Statement of Basis 0310010-014-AV  (pdf) (142.86 KB)

BUCKEYE TAMPA SOUTH TERMINAL  Florida DEP  0570083-044-AV  Renewal  Proposed    3/31/25  4/1/25-5/1/25

Proposed Permit 0570083-044-AV  (pdf) (798.86 KB)

Statement of Basis 0570083-044-AV  (pdf) (130.16 KB)

CMC STEEL FLORIDA  Florida DEP  0310157-023-AV  Modification Draft  02/13/2025-3/17/25     

Draft Permit 0310157-023-AV  (pdf) (1.01 MB)

Statement of Basis 0310157-023-AV  (pdf) (142.87 KB)

CEMEX MIAMI CEMENT PLANT  Florida DEP  0250014-076-AV  Modification with Construction  Draft  02/23/2025-3/25/25     

Draft Permit 0250014-076-AV  (pdf) (1.56 MB)

Statement of Basis 0250014-076-AV  (pdf) (290.81 KB)

OKEELANTA SUGAR REFINERY  Florida DEP  0990005-051-AV  Renewal  Draft  02/18/2025-3/20/25     

Draft Permit 0990005-051-AV  (pdf) (1.39 MB)

Statement of Basis 0990005-051-AV  (pdf) (272.53 KB)

NUTRIEN WHITE SPRINGS PHOS, SWA RIV and SW  Florida DEP  0470002-139-AV  Modification Proposed   3/21/25  3/24/25-4/23/25

Proposed Permit 0470002-139-AV  (pdf) (1.73 MB)

Statement of Basis 0470002-139-AV  (pdf) (233.93 KB)

CENTRAL DISTRICT WASTEWATER TRTMNT PLANT  Florida DEP  0250476-018-AV  Renewal  Proposed    3/17/25 3/18/25-4/18/25

Proposed Permit 0250476-018-AV  (pdf) (1.22 MB)

Statement of Basis 0250476-018-AV  (pdf) (153.32 KB)

U.S. SUGAR CORPORATION  Florida DEP 
 
0510003-065-AV  Renewal  Proposed   

3/17/25 

3/18/25-4/18/25

Proposed Permit 0510003-065-AV  (pdf) (1.74 MB)

Statement of Basis 0510003-065-AV  (pdf) (192.12 KB)

HIALEAH/PRESTON WATER TREATMENT PLANT  Florida DEP 
 
0250281-016-AV  Renewal  Proposed    3/17/25  3/18/25-4/18/25

Proposed Permit 0250281-016-AV (pdf) (968.25 KB)

Statement of Basis 0250281-016-AV (pdf) (248.69 KB)

National Aeronautics and Space Administration Kennedy Space Center

Florida DEP  0090051-042-AV  Modification  Draft  02/27/2025-3/31/25      

Draft Permit 0090051-042-AV  (pdf) (1.24 MB)

Statement of Basis 0090051-042-AV  (pdf) (158.71 KB)

Maverick Boat Group  Florida DEP  1110086-018-AV  Renewal  Draft/Proposed for Concurrent Review  1/31/2025 – 3/2/2025  3/20/2025  3/21/2025 – 5/20/2025 

Draft/Proposed Permit 1110086-018-AV  (pdf) (1.11 MB)

Statement of Basis 1110086-018-AV  (pdf) (120.7 KB)

South District Wastewater Treatment Plant  Florida DEP  0250520-029-AV  Renewal  Final (issued 1/14/2025) 10/23/2024 – 11/22/2024  1/10/2025  1/11/2025 – 3/12/2025 

Final Permit 0250520-029-AV  (pdf) (966.39 KB)

Statement of Basis 0250520-029-AV  (pdf) (183.08 KB)

Final Determination 0250520-029-AV  (pdf) (107.14 KB)

JED Solid Waste Management Facility  Florida DEP  0970079-019-AV  Renewal  Final (issued 1/14/2025)  10/24/2024 – 11/23/2024  1/10/2025  1/11/2025 – 3/12/2025 

Final Permit 0970079-019-AV (pdf) (1003.84 KB)

Final Determination 0970079-019-AV (pdf) (6.74 KB)

Statement of Basis 0970079-019-AV (pdf) (312.32 KB)

Enviva Pellets  Florida DEP  0630058-036-AV  Administrative Amendment  Final (issued 1/13/2025)        Administrative Amendment 0630058-036-AV  (pdf) (250.14 KB)
Lake City New Millennium Building  Florida DEP  0230046-009-AV  Renewal  Draft  1/14/2024 – 2/13/2024     

Draft Permit 0230046-009-AV (pdf) (794.04 KB)

Statement of Basis 0230046-009-AV (pdf) (145.46 KB)

Public Notice 0230046-009-AV (pdf) (125.7 KB)

Florida Power and Light Smith Electric Generating Plant  Florida DEP  0050014-040-AV  Renewal  Final Issued (1/9/2025)  10/9/2024 – 11/8/2024   1/3/2025  1/4/2025 – 3/5/2025 

Statement of Basis 0050014-040-AV  (pdf) (229.65 KB)

Final Determination 0050014-040-AV  (pdf) (6.76 KB)

Final Permit 0050014-040-AV  (pdf) (1.1 MB)

Florida Power and Light – Gulf Clean Energy Center  Florida DEP  0330045-068-AV  Renewal  Final (issued 1/8/2025)  10/14/2024 – 11/13/2024  12/30/2024  12/31/2024 – 3/3/2025 

Final Permit 0330045-068-AV  (pdf) (1.45 MB)

Public Notice 0330045-068-AV  (pdf) (152.12 KB)

Final Determination 0330045-068-AV  (pdf) (6.61 KB)

Mosaic Fertilizer   Florida DEP  1050046-091-AV  Significant Modification  Final (issued 12/13/2024)  10/28/2024 – 11/27/2024  12/30/2024  12/31/2024 -  3/3/2025 

Final Determination 1050046-091-AV (pdf) (107.38 KB)

Final Permit 1050046-091-AV (pdf) (1.18 MB)

Statement of Basis 1050046-091-AV (pdf) (263.94 KB)

Okeelanta Sugar Refinery  Florida DEP 990005-051-AV  Significant Modification  Draft  12/26/2024 – 1/25/2025     

Draft Permit 990005-051-AV  (pdf) (1.38 MB)

Statement of Basis 990005-051-AV  (pdf) (267.23 KB)

Public Notice 990005-051-AV  (pdf) (127.44 KB)

Draft Appendices 990005-051-AV  (pdf) (7.55 MB)

Nutrien White Springs  Florida DEP 0470002-139-AV  Significant Modification  Draft  12/26/2024 – 1/25/2025     

Draft Permit 0470002-139-AV  (pdf) (1.62 MB)

Draft Appendices 0470002-139-AV  (pdf) (10.89 MB)

Public Notice 0470002-139-AV  (pdf) (123.73 KB)

Statement of Basis 0470002-139-AV  (pdf) (243.72 KB)

Seminole Generating Station  Florida DEP 1070025-039-AV  Significant Modification  Final (issued 10/15/2024)  6/6/2024 – 7/6/2024   10/29/2024  10/30/2024 – 12/30/2024 

Final Permit 1070025-039-AV (pdf) (1.44 MB)

Statement of Basis 1070025-039-AV (pdf) (402.05 KB)

Final Determination 1070025-039-AV (pdf) (7.57 KB)

Final Appendices 1070025-039-AV (pdf) (6.35 MB)

While EPA has the right to a 45-day review period for all Proposed Title V permits, EPA Region 4 targets only a subset of these permits for comprehensive review. To find out which permits have been targeted for EPA Region 4 review, please contact the Region 4 staff person, Jacqueline Summers-Evans.

Return to Region 4 Proposed Title V Permits and State Contacts

Instructions for Table: Scroll to the right to view the petition period and the associated files. Click on the title of any column to sort by that column. Users can also use the "Select Columns" button to change or narrow down what columns are displayed.  Use the "Filter rows by text" box to search for specific key words. Click on the "View Files" button in the far right column to view the permit documents in the public docket.

 

As of August 14, 2020, the table of permitting actions on this page is dynamically linked to EPA's national Electronic Permit System (EPS). Permitting actions appear in the table in real time as soon as they are entered into the EPS database, typically on a weekly basis.

Contact Us to ask a question, provide feedback, or report a problem.
Last updated on May 20, 2025
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.