Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. Hazardous Waste Generators

Steps in Complying with Regulations for Hazardous Waste

Identify, Count, Notify, Manage, Transport, and Recycle/Treat/Dispose
 

****NOTE****

In 2016, EPA finalized a rulemaking that made several changes to the hazardous waste generator regulations. The information on this page has been updated to reflect these changes. Check out the rule here.

Identify

Identify each hazardous waste generated. In Title 40 of the Code of Federal Regulations (CFR) Section 261.3 describes the hazardous waste identification regulatory program. In turn, 40 CFR section 262.11 describes the process a person must follow to determine if the solid waste they generated, as defined at 40 CFR section 261.2, is a hazardous waste.
 
  • Hazardous waste identification regulations at 40 CFR part 261
  • Waste identification
  • Resource Conservation and Recovery Act (RCRA) Orientation Manual
  • Definition of solid waste
  • Frequent Questions About Hazardous Waste Identification

 

Count

Sum the total weight of all hazardous wastes that should be counted (Refer to 40 CFR section 262.13(c) and (d)) and self-determine as one of three generator categories:
  • Large Quantity Generators (LQGs) generate 1,000 kilograms (about 2,200 lbs.) or more per month of hazardous waste, more than one kilogram per month of acutely hazardous waste, or more than 100 kilograms per month of acute spill residue or soil.
  • Small Quantity Generators (SQGs) generate more than 100 kilograms, but less than 1,000 kilograms, of hazardous waste per month.
  • Very Small Quantity Generators (VSQGs) generate 100 kilograms or less per month of hazardous waste, or one kilogram or less per month of acutely hazardous waste, or less than 100 kilograms per month of acute spill residue or soil.
  • Learn more about the three generator categories.
  • Learn more about the regulations for these three generator categories.

 

Notify

LQGs and SQGs are required to notify EPA (or their state agency if the state is authorized to operate its own hazardous waste program) of their hazardous waste activities. Some states also require VSQGs to notify. SQGs and LQGs must do so using Form 8700-12:
  • Notification of RCRA Subtitle C Activity - Instructions and Form 8700-12
  • Obtaining Assistance with Hazardous Waste Management Notification and Reporting Requirements provides contact information for state and EPA regional offices where assistance can be obtained.

 

Manage

Manage the hazardous waste according to the specific regulations associated with each generator category.
  • Hazardous waste generator regulatory summary - learn the regulations LQGs, SQGs and VSQGs must comply with. 
Certain waste types and business sectors have unique requirements:
  • Universal wastes - Universal waste rules streamline the hazardous waste management standards for batteries, pesticides, mercury-containing equipment, and bulbs (i.e., lamps).
  • Pharmaceutical hazardous wastes - Healthcare facilities such as pharmacies and hospitals, and retail stores with pharmacies that dispose of pharmaceuticals, may be regulated hazardous waste generators.
  • Hazardous waste generated at academic laboratories - provides standards for managing hazardous waste in academic laboratories.

Transport

A manifest is required of any LQG or SQG that transports, or offers for transport, a hazardous waste off-site. The Hazardous Waste Manifest System website provides the forms, reports, and procedures designed to track hazardous waste from the generator facility where it is produced to the off-site waste management facility that will store, treat, or dispose of it.
 
  • Hazardous waste manifest system webpage

 

Recycle - Treat - Dispose

Generally, small and large quantity generators may recycle their hazardous waste on-site without a permit provided they comply with the waste accumulation time limits and other waste accumulation regulations specified in 40 CFR sections 262.15-17.
 
In addition, a generator may treat their hazardous waste on-site in a generator accumulation unit (e.g., tank or container) without a hazardous waste permit to render it either non-hazardous or less hazardous, provided they comply with all of the applicable hazardous waste generator requirements in 40 CFR sections 262.15-17, and provided that the treatment is not thermal treatment.
 
Otherwise, treatment and disposal of the hazardous waste is subject to the hazardous waste Treatment, Storage, and Disposal Facility (TSDF) regulations of 40 CFR parts 264 and 265 and the permitting regulations of 40 CFR part 270.
 
  • RCRA Orientation Manual  
  • Requirements for TSDFs
If a VSQG exceeds its accumulation quantity limit, or if an SQG or LQG fails to comply with any one of the conditions for exemption at 40 CFR sections 262.15-17, then that generator is operating without a permit or without interim status. Interim status is the period during which an owner or operator of an existing treatment, storage, or disposal facility is treated as having been issued a RCRA permit even though he or she has not yet received a final determination on their permit. 
 
  • Hazardous waste generator requirements at 40 CFR Part 262

Hazardous Waste Generators

  • Basics
  • Regulations
  • Re-notification
  • Industry-Specific Information
  • Guide for Small Businesses
  • Importing or Exporting Hazardous Waste
Contact Us About Hazardous Waste Generators
Contact Us to ask a question, provide feedback, or report a problem.
Last updated on June 14, 2024
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.

Identify Count Notify Manage Transport Treat/Dispose