EPA Approved Statutes and Regulations in the Florida SIP
About this website: This website does not necessarily represent the current version of the SIPs, TIPs, or FIPs. The official SIPs, TIPs, and FIPs are contained in regulations promulgated in the Federal Register and codified in the U.S. Code of Federal Regulations (CFR). While we make every effort to maintain the accuracy of the files accessible here, inconsistencies may occur. Please contact us using the link below if you find any errors in these files.
Updated as of: March 24, 2026
EPA Contact: EPA Region 4: Simone Jarvis (404-562-8393)
EPA-Approved Florida Regulations
| State citation (Section) | Title/subject | State effective date | EPA approval date | Explanation |
|---|---|---|---|---|
| Chapter 62-204 Air Pollution Control—General Provisions | ||||
| 62-204.320 | Procedures for Designation and Redesignation of Areas | 3/13/1996 | 6/16/1999 64 FR 32346 | |
| 62-204.340 | Designation of Attainment, Nonattainment, and Maintenance Areas | 3/13/1996 | 6/16/1999 64 FR 32346 | |
| 62-204.360 | Designation of Prevention of Significant Deterioration Areas | 3/13/1996 | 6/16/1999 64 FR 32346 | |
| 62-204.500 | Conformity | 10/23/2016 | 3/28/2024, 89 FR 21437 | Except paragraphs 62-204.500(1)(a), (1)(b), (1)(c), and (1)(d). |
| Chapter 62-210 Stationary Sources—General Requirements | ||||
| 62-210.200 | Definitions | 10/23/2013 | 7/7/2025, 90 FR 29745 | The ethanol production facility exclusion within the definition of “major stationary source” at 62-210.200 does not apply to 62-212.500. Except the following definitions: “animal crematory”; “biological waste”; “biological waste incinerator”; “biomedical waste”; “capture efficiency”; “cast polymer operation”; “human crematory”; “major source of air pollution,” “major source,” or “title V source”; “printed interior panels”; “unit-specific applicable requirement”; and “waste-to-energy facility”; “CAIR”;“CAIR NOx Allowance”; “CAIR NOx Annual Trading Program”; “CAIR NOx Ozone Season Allowance”; “CAIR NOx Ozone Season Trading Program”; “CAIR NOx Ozone Season Unit”; “CAIR NOx Unit”; “CAIR Part” or “CAIR Permit”; “CAIR Program”; “CAIR SO2 Allowance”; “CAIR SO2 Trading Program”; “CAIR SO2 Unit”; “CAIR Source”; and “CAIR Unit”; and except for “Commence Operation” and “Designated Representative” approved on July 7, 2025, state effective 7/3/2018. |
| 62-210.220 | Small Business Assistance Program | 10/6/2008 | 7/3/2017, 82 FR 30767 | |
| 62-210.300 | Permits Required | 5/9/2007 | 6/1/2009 63 FR 26103 | |
| 62-210.310 | Air General Permits | 6/29/2011 | 10/6/2017, 82 FR 46682 | |
| 62-210.350 | Public Notice and Comment | 10/12/2008 | 7/29/2020, 85 FR 45539 | Except for 62- 210.350(1)(c) |
| 62-210.360 | Administrative Permit Corrections | 11/23/1994 | 6/16/1999 64 FR 32346 | |
| 62-210.370 | Emissions Computation and Reporting | 02/02/2006 | 06/27/2008 73 FR 36435 | |
| 62-210.550 | Stack Height Policy | 11/23/1994 | 6/16/1999 64 FR 32346 | |
| 62-210.650 | Circumvention | 10/15/1992 | 10/20/1994 59 FR 52916 | |
| 62-210.700 | Excess Emissions | 10/23/2016 | 8/4/2023 88 FR 51702 | |
| 62-210.900 | Forms and Instructions | 2/9/1993 | 11/7/1994 59 FR 46157 | |
| Chapter 62-212 Stationary Sources—Preconstruction Review | ||||
| 62-212.300 | General Preconstruction Review Requirements | 6/29/2009 | 4/12/2011 76 FR 20239 | |
| 62-212.400 | Prevention of Significant Deterioration | 3/28/2012 | 9/16/2020, 85 FR 57707 | Except the provisions for the PM2.5 significant impact levels at (5)(b). |
| 62-212.500 | Preconstruction Review for Nonattainment Areas | 02/02/2006 | 06/27/2008 73 FR 36435 | The ethanol production facility exclusion within the definition of “major stationary source” at 62-210.200 does not apply to 62-212.500. |
| 62-212.720 | Actuals Plantwide Applicability Limits (PALs) | 12/17/2013 | 7/3/2017, 82 FR 30767 | |
| Chapter 62-252 Gasoline Vapor Control | ||||
| 62-252.300 | Gasoline Dispensing Facilities Stage I Vapor Recovery | 5/1/2015 | 8/12/2015, 80 FR 48259 | |
| Chapter 62-256 Open Burning and Frost Protection Fires | ||||
| 62-256.100 | Declaration and Intent | 10/6/2008 | 10/6/2017, 82 FR 46682 | |
| 62-256.200 | Definitions | 11/30/1994 | 6/16/1999 64 FR 32346 | |
| 62-256.300 | Prohibitions | 11/30/1994 | 6/16/1999 64 FR 32346 | |
| 62-256.400 | Agricultural and Silvicultural Fires | 7/1/1971 | 5/31/1972 37 FR 10842 | |
| 62-256.450 | Burning for Cold or Frost Protection | 6/27/1991 | 9/9/1994 59 FR 46552 | |
| 62-256.500 | Land Clearing | 11/30/1994 | 6/16/1999 64 FR 32346 | |
| 62-256.600 | Industrial, Commercial, Municipal, and Research Open Burning | 7/1/1971 | 5/31/1972 37 FR 10842 | |
| 62-256.700 | Open Burning Allowed | 11/30/1994 | 6/16/1999 64 FR 32346 | |
| 62-256.800 | Effective Date | 7/1/1971 | 5/31/1972 37 FR 10842 | |
| Chapter 62-296 Stationary Sources—Emission Standards | ||||
| 62-296.100 | Purpose and Scope | 10/6/2008 | 10/6/2017, 82 FR 46682 | |
| 62-296.320 | General Pollutant Emission Limiting Standards | 7/10/2014 | 1/22/2024, 89 FR 3886 | Except 62-296.310(1), (2), and (3), approved on 6/16/1999, state effective 3/13/1996. |
| 62-296.340 | Best Available Retrofit Technology | 1/31/2007 | 8/29/2013 78 FR 53250 | |
| 62-296.401 | Incinerators | 3/13/1996 | 6/16/1999 64 FR 32346 | |
| 62-296.402 | Sulfuric Acid Plants | 6/23/2022 | 8/4/2023 88 FR 51702 | Except for paragraphs (1), (2)(a)2., (2)(b)2., and (3)(b). |
| 62-296.403 | Phosphate Processing | 3/13/1996 | 6/16/1999 64 FR 32346 | |
| 62-296.404 | Kraft (Sulfate) Pulp Mills and Tall Oil Plants | 3/13/1996 | 6/16/1999 64 FR 32346 | |
| 62-296.405 | Fossil Fuel Steam Generators with more than 250 million Btu per Hour Heat Input | 6/23/2022 | 8/4/2023 88 FR 51702 | Except for paragraphs (4)(a)2. through 5., (4)(a)8. and 9., (4)(b)1. and 2., (4)(b)4., and (5)(c). |
| 62-296.406 | Fossil Fuel Steam Generator with less than 250 million Btu per Hour Heat Input, New and Existing Emissions Units | 3/2/1999 | 11/5/2020 | 1/22/2024, 89 FR 3886 |
| 62-296.408 | Nitric Acid Plants | 11/23/1994 | 8/4/2023 88 FR 51702 | Except for paragraph (2). |
| 62-296.409 | Sulfur Recovery Plants | 11/23/1994 | 6/16/1999 64 FR 32346 | |
| 62-296.410 | Carbonaceous Fuel Burning Equipment | 11/23/1994 | 6/16/1999 64 FR 32346 | |
| 62-296.412 | Dry Cleaning Facilities | 3/11/2010 | 10/6/2017, 82 FR 46682 | |
| 62-296.414 | Concrete Batching Plants | 11/5/2020 | 11/6/2023, 88 FR 76137 | |
| 62-296.415 | Soil Thermal Treatment Facilities | 11/5/2020 | 11/6/2023, 88 FR 76137 | |
| 62-296.418 | Bulk Gasoline Plants | 8/14/2019 | 11/6/2023, 88 FR 76137 | |
| 62-296.500 | Reasonably Available Control Technology (RACT)—Volatile Organic Compounds (VOC) and Nitrogen Oxides (NOX) Emitting Facilities | 8/14/2019 | 11/6/2023, 88 FR 76137 | |
| 62-296.501 | Can Coating | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.502 | Coil Coating | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.503 | Paper Coating | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.504 | Fabric and Vinyl Coating | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.505 | Metal Furniture Coating | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.506 | Surface Coating of Large Appliances | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.507 | Magnet Wire Coating | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.508 | Petroleum Liquid Storage | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.510 | Bulk Gasoline Terminals | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.511 | Solvent Metal Cleaning | 11/5/2020 | 11/6/2023, 88 FR 76137 | |
| 62-296.512 | Cutback Asphalt | 8/14/2019 | 11/6/2023, 88 FR 76137 | |
| 62-296.513 | Surface Coating of Miscellaneous Metal Parts and Products | 6/16/2022 | 9/27/2024, 89 FR 79147 | |
| 62-296.514 | Surface Coating of Flat Wood Paneling | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.515 | Graphic Arts Systems | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.516 | Petroleum Liquid Storage Tanks with External Floating Roofs | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.570 | Reasonably Available Control Technology (RACT) - Requirements for Major VOC- and NOX-Emitting Facilities | 6/23/2022 | 8/4/2023 88 FR 51702 | |
| 62-296.600 | Reasonably Available Control Technology (RACT)—Lead | 3/13/1996 | 6/16/1999 64 FR 32346 | |
| 62-296.601 | Lead Processing Operations in General | 8/8/1994 | 9/18/1996 61 FR 49064 | |
| 62-296.602 | Primary Lead Acid Battery Manufacturing Operations | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.603 | Secondary Lead Smelting Operations | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.604 | Electric Arc Furnace Equipped Secondary Steel Manufacturing Operations | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.605 | Lead Oxide Handling Operations | 8/8/1994 | 9/18/1996 61 FR 49064 | |
| 62-296.700 | Reasonably Available Control Technology (RACT)—Particulate Matter | 8/14/2019 | 11/6/2023, 88 FR 76137 | |
| 62-296.702 | Fossil Fuel Steam Generators | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.704 | Asphalt Concrete Plants | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.705 | Phosphate Processing Operations | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.707 | Electric Arc Furnaces | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.708 | Sweat of Pot Furnaces | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.711 | Materials Handling, Sizing, Screening, Crushing and Grinding Operations | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| 62-296.712 | Miscellaneous Manufacturing Process Operations | 7/10/2014 | 11/6/2023, 88 FR 76137 | |
| Chapter 62-297 Stationary Sources—Emissions Monitoring | ||||
| 62-297.310 | General Test Requirements | 3/9/2015 | 10/6/2017, 82 FR 46682 | |
| 62-297.440 | Supplementary Test Procedures | 7/10/2014 | 4/2/2018, 83 FR 13875 | |
| 62-297.450 | EPA VOC Capture Efficiency Test Procedures | 7/10/2014 | 4/2/2018, 83 FR 13875 | |
| 62-297.620 | Exceptions and Approval of Alternate Procedures and Requirements | 11/23/1994 | 6/16/1999 64 FR 32346 | |
| State Statutes | ||||
| 112.3143 | Voting Conflict | 6/29/1999 | 7/30/2012 77 FR 44485 | Paragraph (4) only; to satisfy the requirements of sections 128 and 110(a)(2)(E)(ii). |
| 112.3144 | Full and Public Disclosure of Financial Interests | 10/1/2006 | 7/30/2012 77 FR 44485 | To satisfy the requirements of sections 128 and 110(a)(2)(E)(ii). |
| 120.569 | Decisions which affect substantial interests | 6/24/2011 | 7/30/2012 77 FR 44485 | Subsection (2)(n) only; to satisfy the requirements of section 110(a)(2)(G). |
| 403.131 | Injunctive relief, remedies | 6/15/2001 | 7/30/2012 77 FR 44485 | To satisfy the requirements of section 110(a)(2)(G). |
[64 FR 32348, June 16, 1999]
Editorial Note: For Federal Register citations affecting §52.520, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.fdsys.gov.