Final Approved Enbridge Work Plans - August 2010
These final work plans include but are not limited to oil containment and recovery, pipeline safety, waste treatment, sampling analysis, health and safety, and quality assurance work plans.
- Enbridge Pipeline Trench Backfill Plan - August 17, 2010 (pdf)
- Enbridge Work Plan Part 1: Workplan Cover Sheet - Aug. 18, 2010 (pdf)
- Enbridge Work Plan Part 2: Health and Safety Plan - Aug. 18, 2010 (pdf)
- Enbridge Work Plan Part 3: Pipeline Safety Plan - Aug. 18, 2010 (pdf)
- Enbridge Work Plan Part 4: Sampling & Analysis Plan - Aug. 18, 2010 (pdf)
- Enbridge Work Plan Part 5: Quality Assurance Project Plan - Aug. 18, 2010 (pdf)
- Enbridge Work Plan Part 6: Oil Containment and Recovery Plan - Aug. 18, 2010 (pdf)
- Enbridge Work Plan Part 7: Source Area Response Plan - Aug. 18, 2010 (pdf)
- Enbridge Work Plan Part 8: Response Plan for Downstream Impacted Areas - Aug. 18, 2010 (pdf)
- Enbridge Work Plan Part 9: Oil Recovery and Oil Debris - Aug. 18, 2010 (pdf)
- Enbridge Work Plan Part 10 - Waste Treatment, Transportation and Disposal Plan - Aug. 18, 2010 (pdf)
- Enbridge Work Plan Part 11: Frac Tank Secondary Containment Plan - Aug. 18, 2010 (pdf)