Search Frequent Questions
Filter By:
-
Lead
Total results: 398
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 24
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
- Lead Renovation, Repair and Painting Total results: 237
- Testing for Lead Total results: 19
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 146
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 16 - 30 of 398 results
-
If a renovator disrupts 20 square feet or less of painted surface per side on several sides of the exterior of one property, does the RRP Rule apply?
Yes. To qualify for the exception for minor repair and maintenance activities, the total amount of exterior paint disrupted must be 20 square feet or less. In addition, the job must not use prohibited practices or involve window replacement or demolition of painted surfaces. Question Number: 23002-18379 Find a printable…
- Last published:
-
When installing a roof, my firm does not create dust by directly sanding or cutting painted surfaces, but we do hammer the unpainted side of the lumber from above. Does the RRP Rule apply to this work?
The Lead Renovation, Repair, and Painting (RRP) Rule applies to work that disturbs painted surfaces. If hammering painted components, even on the unpainted side, disturbs paint, creating dust or chips, the RRP Rule applies. Question Number: 23002-23787 Find a printable PDF copy of all frequent questions pertaining to lead…
- Last published:
-
What is a renovation?
The Lead Renovation, Repair, and Painting (RRP) Rule covers activities that modify an existing structure and that result in the disturbance of painted surfaces. All types of repair, remodeling, maintenance, modernization, and weatherization projects are covered, including projects performed as part of another Federal, State, or local program, if the…
- Last published:
-
Is my EPA renovator certification accepted in all states and tribal areas?
Answer: Not necessarily. Whether to accept certification from another jurisdiction is up to the individual state or tribal area. EPA cannot compel states or tribes to adopt programs identical to the Federal program or to establish reciprocity provisions. However, EPA continues to encourage states and tribes that may be considering…
- Last published:
-
My firm is performing a renovation in an unoccupied home that will be put up for sale when work is done. Does the RRP Rule apply to this renovation?
Yes. Temporarily unoccupied or vacant housing is not exempt from the requirements of the Lead Renovation, Repair, and Painting (RRP) Rule . Question Number: 23002-19754 Find a printable PDF copy of all frequent questions pertaining to lead . Other Frequent Questions about the RRP Program General Information Renovations Covered by…
- Last published:
-
What training requirements apply to non-certified workers who have previous EPA/HUD lead-safe work practices training or accredited abatement supervisor or worker training?
The Lead Renovation, Repair, and Painting (RRP) Rule requires certified renovators to provide on-the-job training (OJT) to non-certified workers on the work practices they will be using in performing their assigned tasks. The amount of OJT needed and the topics that need to be covered depend on the knowledge and…
- Last published:
-
When must scaffolding and vertical shrouding be used on an exterior renovation when other buildings are in close proximity to the work area?
The certified renovator or a worker under the direction of the certified renovator must contain the work area so that dust or debris does not leave the work area while the renovation is being performed. The certified renovator must be on site while the containment is established and is responsible…
- Last published:
-
What, if any, additional requirements or liabilities exist if a homeowner independently removes the protective barriers and containment measures implemented by the firm during a renovation?
Before a firm begins a renovation, they are required to comply with all information distribution requirements under the Lead Renovation, Repair and Painting (RRP) Rule and to post signs that clearly define the work area and warn occupants and other persons not involved in renovation activities to remain outside of…
- Last published:
-
If I use a hammer to make a hole is a wall that is two feet on each side, does the RRP Rule apply?
Yes. Although making the hole disrupts less than six square feet of painted surface, using a hammer to make the hole is demolition of the surface, so the minor repair and maintenance exception does not apply. Making the hole using a cut-out technique that does not destroy the section of…
- Last published:
-
If a remodeling company that is a certified firm uses all contractual workers rather than employees, must each contractual worker be a certified renovator, or can the workers be trained on the job by a certified renovator employed by the firm?
Firms hiring contractual workers may provide the certified renovator that oversees the renovation project and provides on-the-job training to contractual workers and other non-certified workers. Question Number: 23002-18377 Find a printable PDF copy of all frequent questions pertaining to lead . Other Frequent Questions about the RRP Program General Information…
- Last published:
-
To avoid harming the homeowner's grass and landscaping, may my firm fold up the plastic sheeting used for containment at night and re-use it the next day?
Yes, as long as your firm does so in a way that contains any dust and debris on the plastic. One way to accomplish this is to collect and remove the paint chips and debris from the plastic sheeting at the end of each day, mist the sheeting and fold…
- Last published:
-
What mil plastic is considered impermeable?
The regulation does not specify a particular thickness of plastic sheeting considered to be impermeable, but rather includes a performance standard. The performance standard requires firms to isolate the work area, prevent dust and debris from exiting and ensure plastic sheeting is not torn or displaced. Certain guidance materials recommend…
- Last published:
-
What records will my firm be required to keep to comply with the Renovation, Repair, and Painting Rule?
The following records must be retained for three years following the completion of a renovation: Reports (if any) certifying that lead-based paint is not present; Records relating to the distribution of the lead pamphlet; and Documentation of compliance with the requirements of the regulation ( EPA has prepared a sample…
- Last published:
-
What are the requirements for covering doorways used to access the work area?
Doors used as an entrance to the work area must be covered with plastic sheeting or other impermeable material in a manner that allows workers to pass through while confining dust and debris to the work area. Question Number: 23002-21413 Find a printable PDF copy of all frequent questions pertaining…
- Last published:
-
Under the Pre-Renovation Education Rule, I have the option of using a certificate of mailing to notify the owner or occupant. What is the difference between a certificate of mailing and certified mail?
A certificate of mailing is a receipt showing evidence of mailing, while certified mail provides proof of mailing and delivery of mail. When using the certificate of mailing option, no record is kept at the mailing office and a receipt is not obtained when mail is delivered to the addressee…
- Last published: