Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. National Pollutant Discharge Elimination System (NPDES)

2017 Construction General Permit (CGP)


  • Construction
    Stormwater
    Overview
  • Getting
    Permit
    Coverage


  • 2017 CGP

  • Proposed
    2022 CGP
  • Submitting an
    NOI, NOT, or
    Low Erosivity Waiver
  • Resources,
    Tools, and
    Templates

On this page:
Construction site runoff with water drain and mud
  • Permit Documents and Forms
  • Final Modification of the 2017 CGP
  • Summary of Basic Requirements
  • Your Requirements for Endangered Species
  • Your Requirements for Historic Properties
  • Small Construction Activity Waivers
  • Frequent Questions
  • Non-compliance Reporting
  • Older CGP Versions

Permit Documents and Forms

EPA's 2017 CGP documents and forms, including the permit, appendices, fact sheet, and paper Notice of Intent (NOI), Notice of Termination (NOT), and Low Erosivity Waiver (LEW), can be found on the CGP permit document page.


Final Modification of the 2017 CGP

EPA modified the 2017 CGP that took effect on June 27, 2019.

  • Learn more about the final modification of the 2017 CGP.

Summary of Basic Requirements

Note that this is only a partial list of your basic responsibilities. You must consult the CGP for details.

  • Read the entire Construction General Permit (see above for permit documents).
  • Develop a Stormwater Pollution Prevention Plan (SWPPP). The SWPPP serves as a roadmap for how you will control your stormwater discharges and comply with the permit.
  • Complete and submit a Notice of Intent (NOI) to EPA via the NPDES eReporting Tool (NeT).
  • Install and maintain erosion and sediment controls throughout the entire construction project so they operate effectively to control your stormwater discharges.
  • Implement pollution prevention controls to minimize the discharge of pollutants from stormwater and spilled or leaked materials.
  • Conduct inspections on the site a) once every 7 calendar days, or b) once every 14 calendar days and within 24 hours of a 0.25-inch storm event.
  • Take corrective action to address any issues with your stormwater controls or discharges.
  • Keep your SWPPP up-to-date to reflect current conditions on your site.
  • Comply with any state, tribal, or territory-specific requirements in Part 9 of the permit.
  • Keep a copy of the permit and all associated records on site during the entire construction project.
  • Submit a Notice of Termination (NOT) once your site is permanently stabilized or when control of the site has been transferred to another operator.
  • Retain all records for at least 3 years from when you file an NOT.

Your Requirements for Endangered Species

Part 1.1.5 and Appendix D of the 2017 CGP require you to determine your eligibility with regard to protection of threatened and endangered species and designated critical habitat. You must make the determination before you submit an NOI for permit coverage. Take note of the criterion (A, B, C, D, E or F) under which you are eligible because you will need to select this and provide supporting documentation in your NOI.
  • See Endangered Species Requirements to determine your Endangered Species Act (ESA) Eligibility under the CGP.

Your Requirements for Historic Properties

Part 1.1.6 and Appendix E of the 2017 CGP require you to complete the screening process with regard to protection of historic properties before you submit an NOI for permit coverage. Follow the procedures in Appendix E of the 2017 CGP – Historic Property Screening Process. Take note of your answers to the screening process questions because you will need to provide this information in your NOI.


Small Construction Activity Waivers

EPA’s regulations allow operators of small construction sites (i.e., sites that disturb five acres or less) to be waived from the requirement to obtain NPDES permit coverage for their stormwater discharges in three limited circumstances:

  • Low Erosivity Waiver (LEW): Small construction sites that have a rainfall erosivity factor (R-factor) of less than five during the period of construction activity are eligible for this waiver. This waiver is dependent on the time period during which construction activity takes place, how long it lasts, and the expected rainfall amount and intensity during that time.
    If your project is located in an area where EPA is the permitting authority, your project disturbs less than five acres, and your R-factor is less than five, you can submit a Low Erosivity Waiver (LEW) form via EPA's NPDES eReporting Tool (NeT) for CGP.
    • Online Rainfall Erosivity Factor Calculator – Estimates the R-factor for a site.
    • Paper Low Erosivity Waiver Certification Form - If the EPA Regional Office has granted you a waiver from electronic reporting, you may submit this paper LEW form.
  • Approved or Established TMDLs: If it is determined that stormwater controls on the small construction site are not necessary based on an EPA-established or -approved total maximum daily load (TMDL) that addresses the pollutants of concern for construction activities (e.g., sediment).
  • Discharges to non-impaired waters: If an equivalent analysis is developed that determines allocations for the pollutant(s) of concern or that such allocations are not needed to protect water quality. The equivalent analysis must be based on existing in-stream concentrations, expected growth in pollutant concentrations from all sources, and a margin of safety.

For more information, see Appendix C of the 2017 CGP or contact your permitting authority.


Frequent Questions

See Frequently Asked Questions for answers to common questions on the construction stormwater permitting program. This is intended to help operators understand the permit. Questions and answers are organized into the following categories:

  • About EPA’s NPDES Construction Stormwater Permitting Program
  • Activities Requiring Coverage Under the 2017 EPA CGP
  • Obtaining CGP Authorization and Terminating Coverage
  • Construction and Development Effluent Limitations Guideline and New Source Performance Standards
  • Erosion and Sediment Control Requirements in the 2017 EPA CGP

Noncompliance Reporting

EPA CGP operators must report any instance of noncompliance that might endanger public health or the environment. They must notify the appropriate EPA regional office in accordance with Appendix I, Part I.12.6.1 of the 2017 CGP, which requires that:

  • Any information must be provided orally within 24 hours from the time you become aware of the circumstances; and
  • A written submission must also be provided within five days of the time you become aware of the circumstances. The written submission must contain a description of the noncompliance and its cause; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent recurrence of the noncompliance.

Report any instance of noncompliance to your EPA regional contact.


Older CGP Versions

View previous versions of EPA’s CGP: 2012, 2008, 2003, 1998, and 1992.

National Pollutant Discharge Elimination System (NPDES)

  • About NPDES
    • Permit Basics
    • State Program Information
    • Permit Limits
    • Program Management and Oversight
    • NPDES Regulations
    • Other Federal Laws that Apply to the NPDES Permit Program
  • All NPDES Program Areas
    • Animal Feeding Operations
    • Aquaculture
    • Forest Roads
    • Industrial Wastewater
    • Municipal Wastewater
      • Combined Sewer Overflows (CSOs)
      • Sanitary Sewer Overflows (SSOs)
      • Peak Flows
      • Integrated Planning
    • National Pretreatment Program
      • Standards and Requirements
      • Roles and Responsibilities
      • Events, Training and Webinars, and Publications
    • Pesticide Permitting
    • Stormwater
      • Construction Activities
      • Industrial Activities
      • Municipal Sources
      • Transportation Sources
      • Oil and Gas Permitting
      • Stormwater Planning
      • EPA's Residual Designation Authority
      • Rules and Notices
    • Water Quality Trading
  • NPDES Technical Resources
    • Resources for Permit Writers
    • NPDES Permit Writers' Manual
    • NPDES Training
    • Tools
    • Electronic Notice of Intent (eNOI)
    • NPDES Applications and Forms
Contact Us About NPDES
Contact Us to ask a question, provide feedback, or report a problem.
Last updated on March 19, 2025
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.