Notice of Preliminary Designation of Certain Stormwater Discharges in the Commonwealth of Massachusetts and Notice of Availability of Draft Permit Under the National Pollutant Discharge Elimination System of the Clean Water Act
The Environmental Protection Agency ("EPA") is providing notice of two proposed actions.
Federal Register Link: https://www.federalregister.gov/documents/2024/10/31/2024-25219/notice-of-preliminary-designation-of-certain-stormwater-discharges-in-the-commonwealth-of
The first action is the Preliminary Designation of certain stormwater discharges from commercial, industrial, and institutional properties with one acre or more of impervious surface in the Charles, Neponset, and Mystic River watersheds in Massachusetts for regulation under the Clean Water Act's ("CWA") National Pollutant Discharge Elimination System ("NPDES") permitting program.
EPA Region 1 is concurrently providing notice of availability of a draft NPDES General Permit for Private Commercial Industrial, and Institutional Stormwater Discharges in the Charles, Mystic, and Neponset River Watersheds in Massachusetts ("Draft CII GP"). Entities included in the Preliminary Designation and eligible for coverage under the Draft CII GP Permit are: commercial, industrial, and institutional properties with one acre or more of impervious surface in the Charles, Neponset, and Mystic River watersheds in Massachusetts.
For more information on this matter please refer to this website.
The public comment period for both of these proposed actions has been extended for 45 days, from January 29, 2025 to March 17, 2025, in response to stakeholder requests. The public comment period will now remain open from October 31, 2024 to March 17, 2025. Interested parties can submit comments on the Preliminary Designation and the Draft Permit using one of the methods outlined below. All comments must be received by March 17, 2025.
- Federal eRulemaking Portal: https://www.regulations.gov/docket/EPA-R01-OW-2024-0492 (our preferred method). Follow the online instructions for submitting comments.
- Email: R1.RDA@epa.gov, and include "Comments on the Preliminary Designation and/or Draft CII GP" in the subject line.
- Mail: U.S. EPA Region 1, Water Division, Attn: Laura Schifman, 5 Post Office Square, Suite 100, Mail Code 06-4, Boston, Massachusetts 02109-3912. If comments are submitted in hard copy form, please also email a copy to R1.RDA@epa.gov.
Relevant documents include:
- Preliminary Determination (pdf)
- Draft Permit (pdf)
- Appendix A - Definitions, Abbreviations, and Acronyms (pdf)
- Appendix B - Standard Permit Conditions Applicable to All Authorized Discharges (pdf)
- Appendix C - Endangered Species Act (pdf)
- Appendix D - National Historic Preservation Act Eligibility Guidance (pdf)
- Appendix E - Determining Impervious Cover Acreage (pdf)
- Appendix F - Phosphorus Reduction Credits for Selected Non-Structural and Structural Stormwater Control Measures ("SCMs") (pdf)
- Appendix G - Notices of Intent ("NOI"), Change ("CNOI"), and Termination ("NOT") (pdf)
- Appendix H - Massachusetts Tax Assessor’s Use Code for CII Land Uses (pdf)
- Appendix I - Operations and Maintenance Requirements (pdf)
- Appendix J - Methodology for Determining Site-Specific Pollutant Calculation (pdf)
- Appendix K - Reporting Requirements for Annual Reports (pdf)
- Fact Sheet (pdf)
- Administrative Record Preliminary Designation
- Administrative Record Draft Permit
- January 7th 2025 - Public Meeting Presentation Slides (pdf)
- January 7th 2025 Public Meeting Recording
For questions contact:
Laura Schifman
US Environmental Protection Agency – Region 1
5 Post Office Square, Suite 100 (WIP06-1)
Boston, MA 02109
Telephone: (617) 918-1015
Email: R1.RDA@epa.gov