Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. Radiation Protection

Subpart W: National Emission Standards for Radon Emissions From Operating Mill Tailings

Subpart W: National Emission Standards for Radon Emissions From Operating Mill Tailings
Basic Information
Legal Authorities
  • 42 U.S.C. §7401
Federal Register Citations
  • 82 FR 5142
  • 54 FR 51703
Code of Federal Regulations Citations
  • 40 CFR Part 61
Docket Numbers
  • EPA-HQ-OAR-2008-0218
Effective Date
  • March 21, 2017
  • December 15, 1989

On this page:

  • Rule Summary
  • Rule History
  • Additional Resources
  • Compliance

Rule Summary

Subpart W protects the public and the environment from the emission of radon-222 from uranium mills and their associated tailings. Since uranium ore generally contains less than one percent uranium, conventional uranium milling produces large quantities of tailings. These tailings are collected in impoundments that vary in size from 20 to 40 acres (“conventional impoundments” in the rule). The tailings contain radium and can emit radon gas.

Subpart W requires operating uranium recovery facilities to employ specific management practices or generally available control technology (GACT) to control radon emissions. “Operating” means that an impoundment is being used for the continued placement of uranium byproduct material or tailings or is in standby status. In-situ leach (ISL) is now more common than conventional milling. ISL primarily produces liquid wastes, which can also emit radon.

Requirements for Conventional Impoundments

Impoundments built before December 15, 1989, are subject to monitoring requirements and must meet a radon-222 emissions standard of 20 picocuries (0.74 becquerel) per square meter per second .

Impoundments built after December 15, 1989 must meet one of the two following work practice standards, and operators must also follow applicable requirements in 40 CFR Part 192.

  • Phased Disposal: There are no more than two conventional impoundments in operation at any time (including existing impoundments), each of which cannot be larger than 40 acres.
  • Continuous Disposal: Tailings are immediately dewatered and disposed of with no more than 10 acres uncovered at any time.

Requirements for Non-Conventional Impoundments

“Non-conventional” impoundments (commonly known as evaporation or holding ponds) hold uranium byproduct material or tailings in ponds suspended in or covered by liquids. Radon emissions from non-conventional impoundments must be controlled by keeping the solid uranium byproduct material or tailings in the ponds saturated with liquid at all times. No solid material may be visible above the liquid level.

Requirements for Heap Leach Piles

Some facilities may use an extraction method known as heap leaching. In some instances uranium ore is of such low grade, or the geology of the ore body is such that it is not cost effective to remove the uranium via conventional milling or through in-situ leach. EPA is requiring heap leach piles that have completed processing but not entered closure to be managed such that there are no more than two such piles, with each no larger than 40 acres.

Construction Requirements for All Impoundments

Subpart W references other regulations that require impoundments to be designed, constructed and installed in a way that protects adjacent soils and waters. These requirements apply to all types of uranium recovery facilities.

Rule History

In accordance with the Clean Air Act Amendments of 1990, EPA formed a workgroup to review the standards at Subpart W. EPA concluded that revisions were necessary. On January 17, 2017, EPA issued revisions to Subpart W. 

View supporting documents related to Subpart W Rulemaking Activity.

View previous rulemaking notices from the Federal Register.

Additional Resources

Subpart W: 2017 Final Rule Fact Sheet (pdf) (148.77 KB) .

Compliance

Uranium recovery facilities must maintain records to demonstrate compliance with requirements for impoundment construction and liquid coverage of ponds. Digital photographs are required to demonstrate liquid levels in non-conventional impoundments. The digital photographs are to be uploaded on at least a monthly basis to the EPA's Subpart W Impoundment Photographic Reporting (SWIPR) system.

All facilities subject to any NESHAP must meet 40 CFR Part 61, Subpart A: General Provisions.

Radiation Protection

  • Radiation Basics
    • Protecting Yourself from Radiation
    • Radiation Health Effects
    • Radiation Sources & Doses
    • Radiation Terms and Units
    • Radionuclides
  • Radiation Dose Calculator
  • Radiation Regulations & Laws
  • Federal Guidance for Radiation Protection
  • Radiological Emergency Response
  • Phosphogypsum
  • TENORM
  • Radiation Protection Document Library
  • Frequent Questions
  • Glossary
Contact Us about Radiation Protection
Contact Us to ask a question, provide feedback, or report a problem.
Last updated on May 23, 2025
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.