Removal Site Evaluation Report: Climax Transfer Station (pdf)
(11.58 MB, July 2022)
The Climax Transfer Station is located in the Shiprock Chapter of the Navajo Nation on Tribal Trust Land approximately 3 miles south of the Shiprock Chapter house. This reports describes the activities and results of investigations to characterize chemical and radiological conditions at the Climax Transfer Station. The primary objective is to provide data required to evaluate the site conditions and to estimate the volume and area of materials impacted by transfer activities. -
Removal Site Evaluation Report: Cove Mine Sites (pdf)
(10.29 MB, October 2022)
The Cove mine sites are located on Tribal Trust Land in Cove Chapter of the Navajo Nation in Apache County, Arizona. This Removal Site Evaluation Report describes the activities performed and summarizes the results of the investigation conducted to characterize chemical and radiological conditions at the Cove mine sites. The primary objective is to provide the data required to evaluate the site conditions and to estimate the volume and area of mining-impacted materials related to historical mining activities. -
Removal Site Evaluation Report: Firelight No. 6 (pdf)
(129.91 MB, April 4, 2023)
The Firelight Mine Site is located within Oljato Chapter of the Navajo Nation (Figure 1-2). This Remedial Site Evaluation Report describes activities performed and summarizes the results of the investigation conducted to characterize chemical and radiological conditions at the mine site. The primary objective is to provide data required to evaluate the site conditions and to estimate the volume and area of mining-impacted material related to historical mining activities. -
Removal Site Evaluation Report: Rock Door No. 1 (pdf)
(116.98 MB, April 18, 2023)
The Rock Door mine site is located in the Oljato Chapter of the Navajo Nation, in San Juan County, Utah, on Tribal Trust Land. The mine site is located in southeastern Utah west of the Monument Valley Tribal Park and is located 9 miles southeast of the Oljato Chapter house. This report describes the activities and results of investigations to characterize chemical and radiological conditions at Rock Door No. 1 Mine Site. The primary objective is to provide the data required to evaluate site conditions and to estimate the volume and area of mining-impacted materials related to historical mining activities. - Group 2 Removal Site Evaluation Work Plan (pdf) (September 23, 2022, 176MB)
This Removal Site Evaluation (RSE) Work Plan for Consent Decree (United States of America and the Navajo Nation 2017) Sites describes the data quality objectives (DQOs), sampling design, and analytical methods to perform RSEs at abandoned uranium mine (AUM) sites (Mine Sites) within the Navajo Nation. - Group 3 Removal Site Evaluation Work Plan (pdf) (December 11, 2023, 231MB)
This Removal Site Evaluation (RSE) Work Plan Addendum describes the RSE work to be performed at 28 Group 3 Mine Sites identified in the Consent Decree (United States of America and the Navajo Nation 2017) at Cyprus Amax Minerals Company Mine Sites on the Navajo Nation. - Tse Tah Removal Site Evaluation Report (pdf) (August 8, 2025, 8.8MB)
This Removal Site Evaluation Report (RSE) Report describes the activities performed and the results of investigations conducted to characterize chemical and radiological conditions at the Tse Tah Mine Sites. - 2024 Site Management Plan for Consent Decree Mine Sites (pdf) (March 18, 2025, 4.3MB)
This 2024 Site Management Plan (SMP) is used as a management tool in planning, reviewing, and setting priorities for investigation and response activities at the 94 Mine Sites and identifies work that is anticipated to be completed from January 1, 2025, through December 31, 2027. - 2025 Site Management Plan for Consent Decree Mine Sites (pdf) (January 30, 2026, 13.3MB)
This 2025 Site Management Plan (SMP) is used as a management tool in planning, reviewing, and setting priorities for investigation and removal activities at 94 Mine Sites and identifies work that is anticipated to be completed from January 1, 2026, through December 31, 2028.